Aqmos R2d272 Installation New Exclusive -

The floor must be solid, and the unit must be secured from toppling. Step 2: Hydraulic Installation (Water Connections)

The floor must be clean, level, and free of debris to avoid puncturing the outer cabinet. Do not install where freezing can occur. Pre-Filtration:

Never wire powered sensors. Keep the system during this phase.

The Aqmos R2D2-72 is designed to treat hard water using an ion-exchange process, offering a capacity of up to 72,000 liters based on a 10°dH hardness reduction. 1. Pre-Installation Requirements and Preparation

The unit must be placed in a frost-free environment protected from moisture and direct sunlight. Outdoor installations are strictly prohibited.

A standard 230V/50Hz electrical outlet must be situated within 1.2 meters of the control valve.